The US Department of Energy (DOE) announces $1.5B for four transmission projects – including connecting the Texas grid to the rest of the US for the first time ever.

The projects, spanning multiple states, will add nearly 1,000 miles of new transmission lines and increase grid capacity by 7,100 megawatts (MW). They’ll boost grid reliability, lower energy costs, and support the clean energy transition.

  • emax_gomax
    arrow-up
    11
    arrow-down
    0
    ·
    11 days ago
    link
    fedilink

    Isn’t it a bit late in the year to be doing this? Like is this because we all know there’s gonna be blackouts in the winter months. Will this be completed in time to prevent that?

    • Pheonixdown
      arrow-up
      37
      arrow-down
      0
      ·
      11 days ago
      link
      fedilink

      The best time to plant a tree is 20 years ago, the 2nd best time is today.

      • ABCDE
        arrow-up
        20
        arrow-down
        7
        ·
        11 days ago
        link
        fedilink

        The 2nd best time would have been 19 years, 11 months and 29 days ago.

    • someguy3
      arrow-up
      14
      arrow-down
      0
      ·
      11 days ago
      link
      fedilink

      Engineering and planning will probably take 2 years. Then years more for eminent domain and actual construction.

    • jonne
      arrow-up
      6
      arrow-down
      0
      ·
      11 days ago
      link
      fedilink

      It’ll probably take years to actually action, it’s not like they can flip a switch, they need to build a ton of infrastructure on both sides to support this.