First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • doggleEnglish
    arrow-up
    0
    arrow-down
    0
    ·
    1 year ago
    link
    fedilink

    Oh, neat. My state did something not completely stupid. I’ve got some reservations about nuke power as opposed to renewable, but this is definitely better than continuing fossil fuels.

    • killa44English
      arrow-up
      0
      arrow-down
      0
      ·
      1 year ago
      link
      fedilink

      Fission and fusion reactors are really more like in-between renewable and non-renewable. Sure, it relies on materials that are finite, but there is way, way more of that material available in comparison to how much we need.

      Making this distinction is necessary to un-spook people who have gone along with the panic induced by bad media and lazy engineering of the past.

      • hamidEnglish
        arrow-up
        1
        arrow-down
        0
        ·
        1 year ago
        edit-2
        7 months ago
        link
        fedilink

        redacted

        • Ryumast3rEnglish
          arrow-up
          0
          arrow-down
          0
          ·
          1 year ago
          link
          fedilink

          I’m spooked by the fact that you have no idea how the US enriches uranium, or the difference between a power pressurized water reactor and a fast “breeder” reactor (if you were thinking of plutonium) or a centrifuge.

          The US enriches uranium using a gas-centrifuge. The US also no longer recycles spent nuclear fuel, but France does.

          • hamidEnglish
            arrow-up
            1
            arrow-down
            0
            ·
            1 year ago
            edit-2
            7 months ago
            link
            fedilink

            redacted